HarborSMR — bounded flexible-export insight for port electrolysis Answer PERMIT The port hydrogen hub may use the SMR insight to run PEM electrolyzer train 2 at 16 MW from 14:00 to 18:00. Reason Why The operator shares only a narrow, expiring insight that a temporary 18 MW flexible-export window is available. The request is for electrolysis dispatch only, the requested 16 MW fits inside the permitted window, safety margins are above threshold, no outage blocks the window, and the policy forbids redistribution for market resale. Raw reactor telemetry stays local. Check C1 OK - reserve margin exceeds the dispatch threshold C2 OK - cooling margin exceeds the dispatch threshold C3 OK - no planned outage blocks the window C4 OK - requested MW fits within the export window C5 OK - serialized insight omits sensitive telemetry terms C6 OK - aggregate excludes core temperature, rod position, neutron flux, and operator IDs C7 OK - policy allows use for electrolysis dispatch before expiry C8 OK - policy prohibits redistribution for market resale C9 OK - scope is explicit: device, event, start, and expiry C10 OK - dispatch plan matches the requested load and power