HarborSMR — bounded flexible-export insight for port electrolysis
PERMIT
The port hydrogen hub may use the SMR insight to run PEM electrolyzer train 2 at 16 MW from 14:00 to 18:00.
The operator shares only a narrow, expiring insight that a temporary 18 MW flexible-export window is available. The request is for electrolysis dispatch only, the requested 16 MW fits inside the permitted window, safety margins are above threshold, no outage blocks the window, and the policy forbids redistribution for market resale. Raw reactor telemetry stays local.
C1 OK - reserve margin exceeds the dispatch threshold
C2 OK - cooling margin exceeds the dispatch threshold
C3 OK - no planned outage blocks the window
C4 OK - requested MW fits within the export window
C5 OK - serialized insight omits sensitive telemetry terms
C6 OK - aggregate excludes core temperature, rod position, neutron flux, and operator IDs
C7 OK - policy allows use for electrolysis dispatch before expiry
C8 OK - policy prohibits redistribution for market resale
C9 OK - scope is explicit: device, event, start, and expiry
C10 OK - dispatch plan matches the requested load and power